Ready Rack
The Ready Rack system is designed to be flexible. From large utility scale projects, to small residential projects, and everything in-between. The hardware design is a simple configuration that allows contractors to install at lightning fast speed with adjustable features built in.
Spec SheetReady Rack
- Helical, ground screw or ballast foundation capabilities.
- Ideal for bifacial modules.
- Simplistic, cost-effective design.
- Preferred choice for sites with terrain that require maximum flexibility.
Standard Specifications
Engineering: ASCE 7-10
Grounding: Grounding hardware provided
Racking Coating: Galvanized; G90 – higher available upon request
Foundation: Helical, Screw or Ballast
Anchor Depth: Varies based on project
Tilt Angles: 5°-35° Options
Wind Loading: Up to 150mph
Snow Loading: Up to 100psf
Mounting Orientation: 2-High Portrait
Warranty: 25 Years
Documents
Foundation Options
The Ready Rack system is compatible with helical, screw or ballast foundations, making it a great choice no matter what your project requires.
Helical
Helical foundations are available in 3.5″ up to 10″ in diameter, and are a cost effective option for most soil types.
Screw
Screw foundations are available in 47″ to 85″ lengths, and are ideal for soils that contain glacial till, cobble and hardpan.
Ballast
For non-penetrable soils, the geo-ballast foundation offers a solution without the need for expensive concrete.
Versatile
This system is made to adapt to any situation, including changes to modules, layouts and terrain. The simplistic hardware allows contractors to streamline the install process with adjustable features for challenging sites.
Highlights
Ready Rack Cloverdale, CA
North Carolina
California
West Des Moines, Iowa
Rossford, Ohio
Thomson, Illinois
Fort Mohave, AZ
Aulander, North Carolina
Snow Hill, North Carolina
Ready to get started?
- Screw or Helical Foundation
- Integrates with 3rd party tracker
- Cost effective
- 2-High Portrait
- Pile Foundation
- 3 or 4 Rail Design
- 2-High Portrait
- Screw or Helical Foundation
- 3 or 4 Rail Design